TRUNG LUONG – MY THUAN HIGHWAY, PHRASE 1

Total investment: VND 14,600 billion

Investment form: BOT, the Trung Luong-My Thuan BOT JSC is the developer where CII B&R (a subsidiary of CII) owns 10% of the legal capital

Concession method: Toll way charge collection

Total length of the route is 51.1 km starting from Than Cuu Nghia intersection and ending at the National Road 30 intersection. The road width is 13.75 m including 2 road lanes of 3.5 m width and 2 subsidiary lanes of 2.75 m width.

The project is expected to commence in early 2015 and completed in 2018.